The probe into signal failure in the Ambattur-Avadi section exposes violation of safety rules
Documents accessed by The Hindu reveal that the automatic signal, S192, malfunctioned over 50 times in February 2026 alone. A buzzer installed in the Ambattur Station Master’s office to alert the staff to signal failures was found to have been “disconnected”. The defective signal was repeatedly reset by field technical workers without analysing the root cause of the malfunction
· 7/14/2026, 3:34:14 PM· 2 min read

Documents accessed by The Hindu reveal that the automatic signal, S192, malfunctioned over 50 times in February 2026 alone. A buzzer installed in the Ambattur Station Master’s office to alert the staff to signal failures was found to have been “disconnected”. The defective signal was repeatedly reset by field technical workers without analysing the root cause of the malfunction
Read original story →Related stories

india
Farooq Abdullah’s brother Mustafa Kamal, ex-minister who balanced politics with medical career, dies at 84

india
Assembly panel pitches for Singapore-style makeover of Visakhapatnam zoo

india
A.P. approves ₹1,638.52 crore for phase-II expansion of three greenfield ports
india